- Fire Resistance Subway pannelling Hammersmith and City
- The scope of the works required design, supply and install 2 hour fire resistance fire fighters lobby which was loacted in a tunnel cross passage. The design also incorporated 2 hour doorsets. FM Blue with a stainless steel type finish was successfully installed and subsequently used for a comms cabinet at the same station
- 4hr Hydrocarbon Fire & Flood Wall
- In direct response to British Energy at Heysham, Furmanite designed, supplied and installed a fire & flood barrier. FM Blue was installed to provide a 3-hour hydrocarbon fire rating and 6Kn/M² flood resistance.
- Fire Fighters Lobby & Comms Cabinet Enclosure
- The scope of the works required design, supply and install 2 hour fire resistance fire fighters lobby which was loacted in a tunnel cross passage. The design also incorporated 2 hour doorsets. FM Blue with a stainless steel type finish was successfully installed and subsequently used for a comms cabinet at the same station