Technical Requirements

Kings Cross Re-development
  • Project: Kings Cross Underground Station Re-development project
  • Fire Resistance Subway pannelling Hammersmith and City
  • The scope of the works required design, supply and install 2 hour fire resistance fire fighters lobby which was loacted in a tunnel cross passage. The design also incorporated 2 hour doorsets. FM Blue with a stainless steel type finish was successfully installed and subsequently used for a comms cabinet at the same station
Heysham & Hartlepool Nuclear Power Station
  • Project: Heysham & Hartlepool Nuclear Power Station
  • 4hr Hydrocarbon Fire & Flood Wall
  • In direct response to British Energy at Heysham, Furmanite designed, supplied and installed a fire & flood barrier. FM Blue was installed to provide a 3-hour hydrocarbon fire rating and 6Kn/M² flood resistance.
Kings Cross Northern Line Underground Station
  • Project: Kings Cross Northern Line Underground Station
  • Fire Fighters Lobby & Comms Cabinet Enclosure
  • The scope of the works required design, supply and install 2 hour fire resistance fire fighters lobby which was loacted in a tunnel cross passage. The design also incorporated 2 hour doorsets. FM Blue with a stainless steel type finish was successfully installed and subsequently used for a comms cabinet at the same station
Victoria Station re-development
  • Project: Victoria Station re-development
  • Various FM Blue systems
British Telecom Tunnels
  • Project: British Telecom Tunnels
  • London, Birmingham & Manchester